A generated station has a maximum demand of 30MW, a load factor of 60% and plant capacity factor of 50%. The reserve capacity of the plant is - active cricket

Breaking

active cricket

Ladies only

Featured Post

test banner

Post Top Ad

Responsive Ads Here

Post Top Ad

Responsive Ads Here

Wednesday, 20 April 2016

A generated station has a maximum demand of 30MW, a load factor of 60% and plant capacity factor of 50%. The reserve capacity of the plant is

adsense ads
A)     5MW
B)      4MW
C)      6MW
             D)     10MW