A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be: - active cricket

Breaking

active cricket

Ladies only

Featured Post

test banner

Post Top Ad

Responsive Ads Here

Post Top Ad

Responsive Ads Here

Monday, 22 February 2016

A generating station has a maximum demand of 500 MW. The annual load factor is 50 percent. The energy generated per annum will be:

adsense ads
A) 2.19 x 106 MWhr
B) 600 MWhr
C) 250 MWhr
D) 7.50 x 106 MWhr
adsense ads

No comments:

Post a Comment

Post Top Ad

Responsive Ads Here